An ADU in Tacoma typically costs about $180,000 to $390,000 with Cascade Pro, Inc., depending on the size of the unit and the site. Tacoma typically processes ADU permits in 4 to 8 weeks, and most ADUs, including detached ADUs, take about 3 to 6 months to build once the permit is approved. This guide explains what drives the price and how the process works. The range is a general guide, not a quote.
Cascade Pro, Inc. is a licensed general contractor at 748 Market St Suite 90 in downtown Tacoma. We design and build ADUs, DADUs and garage conversions for homeowners in Tacoma and Pierce County. Updated November 28, 2026.
As a typical range, our ADU projects cost about $180,000 to $390,000. Where a project lands depends on the type of ADU, the size of the unit, the condition of the existing structure for conversions, the site, and the finishes you choose. The best way to get an accurate number is a free consultation and a detailed estimate.
| Type of ADU | What it is | How the cost compares |
|---|---|---|
| Garage conversion | An attached or detached garage turned into finished living space, with insulation, electrical, plumbing, HVAC and required egress. | Generally the most affordable option, because the structure already exists. It typically costs less and takes less time than a ground-up build. |
| Detached ADU (DADU) | A standalone building on your lot, sometimes called a backyard cottage, built from the foundation up. | Costs more than a conversion, because it includes foundation, framing, roofing, utility connections and interior finishes. It offers complete design flexibility. |
| Basement ADU | An unfinished or underused basement converted into a separate unit. | Can be cost-effective if you already have a full or partial basement. Cost depends on egress windows, ceiling height, waterproofing, and the plumbing and electrical work needed. |
Tacoma typically processes ADU permits in 4 to 8 weeks, depending on the scope of the project. Once the permit is approved, most ADUs, including detached ADUs, take about 3 to 6 months to build. Garage and basement conversions can often be completed faster, since the existing structure reduces construction time.
| Step | What happens |
|---|---|
| 1. Free consultation | We visit your property, discuss your goals, review your lot for feasibility, and provide a preliminary scope and budget estimate. There is no cost and no obligation. |
| 2. Design and engineering | We create detailed plans including structural engineering, electrical layouts and plumbing schematics. All designs comply with current Washington State residential building codes. |
| 3. Permitting | We submit plans to the city, manage the review process and address any comments from plan reviewers. Tacoma typically processes ADU permits in 4 to 8 weeks, depending on the scope of the project. |
| 4. Construction | We build your ADU mostly with our own crew. You get a dedicated project manager, regular progress updates and a clean job site. Most ADU projects take 3 to 6 months from permit approval to completion. |
| 5. Final inspection and handoff | We schedule all required final inspections, address any corrections, and hand you the keys to a finished, code-compliant unit. |
| Rule | What the City of Tacoma says |
|---|---|
| How many ADUs | Up to two ADUs on a property, attached or detached. |
| Size | The living area of an ADU is limited to 1,000 square feet, excluding garages and other non-living areas. |
| Parking | Parking is not required for ADUs. |
| Detached ADU setbacks | A minimum of 5 feet from side property lines and 15 feet from the rear property line, except no setback is required from alleys. |
| Height | ADUs must meet the height limits of the zoning district where they are located. |
| Permits | Construction permits are required for creating, converting or legalizing an ADU. Applications go in online at TacomaPermits.org. |
| Pre-approved plans | The city offers pre-approved detached ADU plans in four base models. |
| Short-term rentals | To operate a short-term rental, the property owner must occupy either the primary dwelling or the ADU. |
Source: City of Tacoma, Accessory Dwelling Units, content current as of August 7, 2026. We checked it on November 28, 2026. Rules change, and each lot is different, so we confirm what applies to your property during the free consultation.
An ADU, or accessory dwelling unit, is a second, smaller home on the same lot as a main house. It can be inside the house, attached to it, or a separate building. A DADU is a detached ADU: a separate building in the yard, often called a backyard cottage. Read more on our ADU and DADU page and our garage conversion page.
No. It is a typical range for our ADU projects. Your price depends on the size of the unit and your site. We provide free, no-obligation estimates so you know what to expect before work begins.
Garage conversions are generally the most affordable ADU option, because you are working with an existing structure. The final cost depends on the size of the garage, the structural modifications needed, and the level of finish.
Yes. We manage the entire permitting process, including plan submission, revisions, and coordination with inspectors.
Most residential lots in Tacoma are eligible for at least one ADU, though requirements vary by zoning, lot size, and access. During our consultation, we verify your lot’s eligibility and walk you through what is possible on your property.
Call (253) 338-1693 or fill out the form on this page. We visit your property, evaluate your options, and provide a clear estimate.
“Cascade Pro built us a beautiful 600 sq ft two bedroom ADU in our backyard, and we couldn’t be happier. Professional, honest, and extremely knowledgeable about ADU construction and permits.
The project was smooth, well organized, and the final result looks amazing. Highly recommend them for anyone looking to build an ADU.”
Marley Lucas, Google review, 5 stars, December 2025
“Amazing garage to ADU conversion! The quality of work exceeded our expectations and the new ADU looks like it was always part of the house.”
MrRedDevil Spud, Google review, 5 stars, December 2025