ADU Cost and Process Guide for Tacoma

An ADU in Tacoma typically costs about $180,000 to $390,000 with Cascade Pro, Inc., depending on the size of the unit and the site. Tacoma typically processes ADU permits in 4 to 8 weeks, and most ADUs, including detached ADUs, take about 3 to 6 months to build once the permit is approved. This guide explains what drives the price and how the process works. The range is a general guide, not a quote.

Cascade Pro, Inc. is a licensed general contractor at 748 Market St Suite 90 in downtown Tacoma. We design and build ADUs, DADUs and garage conversions for homeowners in Tacoma and Pierce County. Updated November 28, 2026.

How Much Does an ADU Cost in Tacoma?

As a typical range, our ADU projects cost about $180,000 to $390,000. Where a project lands depends on the type of ADU, the size of the unit, the condition of the existing structure for conversions, the site, and the finishes you choose. The best way to get an accurate number is a free consultation and a detailed estimate.

Type of ADUWhat it isHow the cost compares
Garage conversionAn attached or detached garage turned into finished living space, with insulation, electrical, plumbing, HVAC and required egress.Generally the most affordable option, because the structure already exists. It typically costs less and takes less time than a ground-up build.
Detached ADU (DADU)A standalone building on your lot, sometimes called a backyard cottage, built from the foundation up.Costs more than a conversion, because it includes foundation, framing, roofing, utility connections and interior finishes. It offers complete design flexibility.
Basement ADUAn unfinished or underused basement converted into a separate unit.Can be cost-effective if you already have a full or partial basement. Cost depends on egress windows, ceiling height, waterproofing, and the plumbing and electrical work needed.

What Drives the Cost of an ADU?

  • The type of ADU: a conversion uses a structure you already have; a detached ADU is new construction.
  • Size and layout: a studio, a one bedroom unit or a two bedroom family space.
  • The existing structure: for conversions, the structural modifications needed.
  • The site: site preparation and utility connections.
  • Kitchen and bathroom: the extent of plumbing and electrical work.
  • Finishes: from a basic finish to premium materials.

How Long Does It Take to Build an ADU in Tacoma?

Tacoma typically processes ADU permits in 4 to 8 weeks, depending on the scope of the project. Once the permit is approved, most ADUs, including detached ADUs, take about 3 to 6 months to build. Garage and basement conversions can often be completed faster, since the existing structure reduces construction time.

What Are the Steps to Build an ADU?

StepWhat happens
1. Free consultationWe visit your property, discuss your goals, review your lot for feasibility, and provide a preliminary scope and budget estimate. There is no cost and no obligation.
2. Design and engineeringWe create detailed plans including structural engineering, electrical layouts and plumbing schematics. All designs comply with current Washington State residential building codes.
3. PermittingWe submit plans to the city, manage the review process and address any comments from plan reviewers. Tacoma typically processes ADU permits in 4 to 8 weeks, depending on the scope of the project.
4. ConstructionWe build your ADU mostly with our own crew. You get a dedicated project manager, regular progress updates and a clean job site. Most ADU projects take 3 to 6 months from permit approval to completion.
5. Final inspection and handoffWe schedule all required final inspections, address any corrections, and hand you the keys to a finished, code-compliant unit.

What Are Tacoma’s ADU Rules?

RuleWhat the City of Tacoma says
How many ADUsUp to two ADUs on a property, attached or detached.
SizeThe living area of an ADU is limited to 1,000 square feet, excluding garages and other non-living areas.
ParkingParking is not required for ADUs.
Detached ADU setbacksA minimum of 5 feet from side property lines and 15 feet from the rear property line, except no setback is required from alleys.
HeightADUs must meet the height limits of the zoning district where they are located.
PermitsConstruction permits are required for creating, converting or legalizing an ADU. Applications go in online at TacomaPermits.org.
Pre-approved plansThe city offers pre-approved detached ADU plans in four base models.
Short-term rentalsTo operate a short-term rental, the property owner must occupy either the primary dwelling or the ADU.

Source: City of Tacoma, Accessory Dwelling Units, content current as of August 7, 2026. We checked it on November 28, 2026. Rules change, and each lot is different, so we confirm what applies to your property during the free consultation.

What Is the Difference Between an ADU and a DADU?

An ADU, or accessory dwelling unit, is a second, smaller home on the same lot as a main house. It can be inside the house, attached to it, or a separate building. A DADU is a detached ADU: a separate building in the yard, often called a backyard cottage. Read more on our ADU and DADU page and our garage conversion page.

ADU Cost and Permit Questions

Is the $180,000 to $390,000 range a quote?

No. It is a typical range for our ADU projects. Your price depends on the size of the unit and your site. We provide free, no-obligation estimates so you know what to expect before work begins.

Which type of ADU costs the least?

Garage conversions are generally the most affordable ADU option, because you are working with an existing structure. The final cost depends on the size of the garage, the structural modifications needed, and the level of finish.

Does Cascade Pro handle the permits?

Yes. We manage the entire permitting process, including plan submission, revisions, and coordination with inspectors.

Can I build an ADU on my property in Tacoma?

Most residential lots in Tacoma are eligible for at least one ADU, though requirements vary by zoning, lot size, and access. During our consultation, we verify your lot’s eligibility and walk you through what is possible on your property.

How do I get an estimate?

Call (253) 338-1693 or fill out the form on this page. We visit your property, evaluate your options, and provide a clear estimate.

What Clients Say About Their ADUs

“Cascade Pro built us a beautiful 600 sq ft two bedroom ADU in our backyard, and we couldn’t be happier. Professional, honest, and extremely knowledgeable about ADU construction and permits.
The project was smooth, well organized, and the final result looks amazing. Highly recommend them for anyone looking to build an ADU.”

Marley Lucas, Google review, 5 stars, December 2025

“Amazing garage to ADU conversion! The quality of work exceeded our expectations and the new ADU looks like it was always part of the house.”
MrRedDevil Spud, Google review, 5 stars, December 2025

Get Your free Estimate Today